Specialized in excavation demolition trucking hauling junk removal DCI bz is licensed insured and bonded We serve in Snohomish King Pierce Counties

  • TRUCKING

    We always ask that the owner inspect our work and give their final approval before making payment...

    Read More
  • HAULING

    There are a wide variety of residential demolition jobs that change depending on the type of building/structure as well as the area surrounding the site...

    Read More
  • DEMOLITION

    We have worked with numerous home owners/do-it yourselfers and several major city projects. Our costumers are always amazed how quickly and professionally we can complete their projects.

    Read More

Thursday, June 18, 2015

We show as a building explodes to demolish

We show as a building explodes to demolish

DCI Demolition  we show as a building explodes to demolish. You can demolish a stone wall with a sledgehammer, and it's fairly easy to level a five-story building using excavators and wrecking balls. But when you need to bring down a massive structure, say a 20-story skyscraper, you have to haul out the big guns. Explosive demolition is the preferred method for safely and efficiently demolishing larger structures. When a building is surrounded by other buildings, it may be necessary to "implode"the building, that is, make it collapse down into its footprint.
In this article, we'll find out how demolition crews plan and execute these spectacular implosions. The violent blasts and billowing dust clouds may look chaotic, but a building implosion is actually one of the most precisely planned, delicately balanced engineering feats you'll ever see.
The Bigger They Come, the Harder They Fall
The basic idea of explosive demolition is quite simple: If you remove the support structure of a building at a certain point, the section of the building above that point will fall down on the part of the building below that point. If this upper section is heavy enough, it will collide with the lower part with sufficient force to cause significant damage. The explosives are just the trigger for the demolition. It's gravity that brings the building down.
Demolition blasters loadexplosives on several different levels of the building so that the building structure falls down on itself at multiple points. When everything is planned and executed correctly, the total damage of the explosives and falling building material is sufficient to collapse the structure entirely, so cleanup crews are left with only a pile of rubble.

In order to demolish a building safely, blasters must map out each element of the implosion ahead of time. The first step is to examine architectural blueprints of the building, if they can be located, to determine how the building is put together. Next, the blaster crew tours the building (several times), jotting down notes about the support structure on each floor. Once they have gathered all the raw data they need, the blasters hammer out a plan of attack. Drawing from past experiences with similar buildings, they decide what explosives to use, where to position them in the building and how to time their detonations. In some cases, the blasters may develop 3-D computer models of the structure so they can test out their plan ahead of time in a virtual world.
The main challenge in bringing a building down is controlling which way it falls. Ideally, a blasting crew will be able to tumble the building over on one side, into a parking lot or other open area. This sort of blast is the easiest to execute, and it is generally the safest way to go. Tipping a building over is something like felling a tree. To topple the building to the north, the blasters detonate explosives on the north side of the building first, in the same way you would chop into a tree from the north side if you wanted it to fall in that direction. Blasters may also secure steel cables to support columns in the building, so that they are pulled a certain way as they crumble.
Sometimes, though, a building is surrounded by structures that must be preserved. In this case, the blasters proceed with a true implosion, demolishing the building so that it collapses straight down into its own footprint (the total area at the base of the building). This feat requires such skill that only a handful of demolition companies in the world will attempt it.

Blasters approach each project a little differently, but the basic idea is to think of the building as a collection of separate towers. The blasters set the explosives so that each "tower" falls toward the center of the building, in roughly the same way that they would set the explosives to topple a single structure to the side. When the explosives are detonated in the right order, the toppling towers crash against each other, and all of the rubble collects at the center of the building. Another option is to detonate the columns at the center of the building before the other columns so that the building's sides fall inward.


Generally speaking, blasters will explode the major support columns on the lower floors first and then a few upper stories. In a 20-story building, for example, the blasters might blow the columns on the first and second floor, as well as the 12th and 15th floors. In most cases, blowing the support structures on the lower floors is sufficient for collapsing the building, but loading columns on upper floors helps break the building material into smaller pieces as it falls. This makes for easier cleanup following the blast.According to Brent Blanchard, an implosion expert with the demolition consulting firm Protec Documentation Services, virtually every building in the world is unique. And for any given building, there are any number of ways a blasting crew might bring it down. Blanchard notes the demolition of the Hayes Homes, a 10-building housing project in Newark, New Jersey, which was demolished in three separate phases over the course of three years. "A different blasting firm performed each phase," Blanchard says, "and although all of the buildings were identical, each blaster chose a slightly different type of explosive and loaded varying numbers of support columns. They even brought the buildings down in different mathematical sequences, with varying amounts of time factored in between each building's collapse."
Once the blasters have figured out how to set up an implosion, it's time to prepare the building. In the next section, we'll find out what's involved in pre-detonation prepping and see how blasters rig the explosives for a precisely timed demolition.

Our company grows to advanced security steps to do the job well. Our customers confirm the quality of our service when they have required Demolition, Trucking, Hauling, and Junk Removal.
We invite you to follow us on Facebook andTwitter. We visited our headquarters in 6017 Reid Dr Nw
Gig Harbor, WA 98335 USA Gig Harbor WA 98335 USA

Friday, June 12, 2015

Principal Demolition Methods

Principal Demolition Methods
Demolition methods can vary depending on the area where it will be held on, the building material, the purpose of the demolition and the way that debris is going to be disposed. In the article we present with some of the most used methods for demolition of structures.

Demolition Method: Implosion

Implosion is a violent bursting inward that allows the sequential elimination of structure supports.
Enough explosives are used to eliminate the critical vertical structural supports. Theplacement of the charges and the sequential detonation timing is if vital importance, allowing the collapse of the building induced by the weight of the structure. Implosion demolition methods are used in urban areas and often involve large structures.
For a successful demolition a complete set of structural blueprints must be analyzed to study the main component of such building. Also another important step is to have theblaster crew complete an assessment of the structure of the buildings to identify other areas that need to be blasted, in addition to the ones identify on the blueprints. As a final step is important to decide the type of explosives to use, where to position them in the building and how to time their detonations.

High Reach Arm

High reach arm is another traditional method of demolition. The threshold for defining a high reach demolition is when it reaches a height of more than 20 meters.
This method is usually formed by a base machine (excavator, tank, engine, counterweights), a demolition arm consisting of three sections or by a telescopic boom and a primary tool attached to the base machine (crushers, shears, hammers).
High reach demolition machines can be equipped with different tools to make them suitable for executing demolitions of structures. This method is used on reinforced concrete, masonry, steel and mixed material structures. The machines used in this type of demolition are not the only machines used in the process; there must be additional components used for secondary operations such as crunching of material. Several factors control the method like the height of the structure being demolished, site conditions and structure shape.

Demolition Method: Crane & Ball

One of the oldest and most commonly used methods for building demolition, the ball and crane use a wrecking ball weighing up to 13,500 pounds to demolish concrete and masonry structures. During the process, the ball is either dropped onto or swung into the structure that is to be demolished. The ball and crane, however, is unsuitable for all demolition applications. Some limitations:
  • Additional work removing rebar in concrete structures is needed.
  • Only highly skilled and experienced crane operators should be used on ball and crane demolition
  • Smoothness in controlling the swing of the ball is CRITICAL since missing the target may tip or overload the crane.
  • The size of the building that can be demolished with this method is limited by crane size and working room, including proximity to power lines.
  • This form of demolition creates a great deal of dust, vibrations and noise.

Demolition Method: Selective Demolition

Also known as strip-out, this process is very popular right now. As recycling andsalvaging of material are very attractive to builders during these days, allowing them to re-use material or recycle it. Selective interior / exterior demolition or recycle of wood, brick, metals and concrete are all recycled for future use in new structures blending the old with the new. This demolition process is not limited to removal of interior equipment, walls, floor, ceilings and exterior components. The main purpose of this method is to recover the maximum amount of primarily reusable and secondary recyclable material in a safe and cost-effective procedure. Although it is a labor intensive process and can be very difficult to achieve in a timely and economical manner for light framed buildings.

DCI Demolition  has been providing procurement of heavy industry in the city of Seattle for long. Our commitment to quality work, safety and strong relationships with our customers have made us a leader in the industry. Visit us online to learn more about our construction work excavation, demolition trucking, hauling.

Sunday, May 31, 2015

Demolition Procedure

Pre- Demolition



  1. Disconnect all services, power, gas, water etc.
  2. Locate stormwater and sewer drains and seal at points of discharge.
  3. Protect adjoining property as required by the building surveyor.
  4. provide temporary bracing and shoring where required.
Demolition Begins
  1. Remove loose or attached fittings and built in fixtures, internally and externally.
  2. Remove external wall cladding, attached chimneys, outbuildings and lean to structures.
  3. Remove internal linings.
Part 1
  1. Make sure building is adequately braced during the removal of cladding.
  2. Remove plumbing anf electrical wires and pipes.
  3. Remove roof covering and restraining and loose materials to avoid possibility of material beongs airbone.
Part 2
  1. Remove roof structure and provide temporary bracing and shoring as required.
  2. Remove wall panel or farming and provide temporary bracing and shoring required.
  3. Remove floor structure.
  4. Remove footings.
Part 3
  1. Clean up site.
  2. Fill in excavations.
  3. Check for any hazards
  4. Clean site entry points and infrastructure where necessary.
Visit us online www.dcidemolition.com to learn more about our construction work excavation, demolition trucking, hauling.

Wednesday, May 20, 2015

What is Excavation?


The excavation is the process of moving earth, rock or other materials with proper tools and equipment, explosives were also used in some occasions. The excavation has important applications including exploration, environmental restoration, mining, construction and demolition. Including the construction is one of the most common applications for excavation.

In DCI Demolition, how does the process?

Before the excavation process can begin, the site should be carefully examined to ensure that the natural habitat and artifacts that surround it are persevered in any excavation. Then they plan for the size and depth of the site and make excavation company draws pictures of them to clearly mark the boundaries of the excavation site. Once you have taken these two important steps, excavation work can begin. All the excavation process includes:

establishing benchmarks corner
the topography of the ground and upper levels
excavation depth approved
dress the loose soil
doing to cut level
the construction of wells and trenches dehydration interconnection
making the building limits
construction of levees and drains
When building excavation used?

Who conducts the digging?


Excavation construction requires experience, skill and attention to detail. In DCI Demolition  we deal with large structures and cremos the basis for the entire project.
We use advanced techniques, tools and heavy to ensure that the job is well done machinery. Hiring a contractor to complete heavy industry large excavation projects best results will be obtained. DCI you to choose the best option Demolition ised in the market for companies in the industry and in the state of Washignton.
DCI Demolition  has been providing procurement of heavy industry in the city of Seattle for long. Our commitment to quality work, safety and strong relationships with our customers have made us a leader in the industry. Visit us online to learn more about our construction work excavation, demolition trucking, hauling.

Tuesday, May 12, 2015

Watch us in action

We are ready to make your demolition project. Quality and responsibility is our goal for our customers.

Posted by DCI.bz on Tuesday, May 5, 2015

Posted by DCI.bz on Friday, May 1, 2015

Our New Domain

We have acquired our new domain www.dcidemolition.com. We know the importance of our visibility on the web. That's why we work every day aware of enabling our customers come to us when they do a search on google.

www.dcidemolition.com allows us to shorten distance between your need and our service. Our goal is to do everything necessary for you our valued customer, find our services easily from a simple Web search.

Our company grows to advanced security steps to do the job well. Our customers confirm the quality of our service when they have required Demolition, Trucking, Hauling, and Junk Removal.

We invite you to follow us on Facebook andTwitter. We visited our headquarters in 6017 Reid Dr Nw
Gig Harbor, WA 98335
USA Gig Harbor WA 98335 USA

Friday, May 1, 2015

What is Excavating Contractor?

In the world of construction, excavation contractors do much more than haul dirt around; their responsibilities include site preparation, grading, trenching and many other soil-related tasks. And, yes, they do operate some very large pieces of heavy equipment.


Site Preparation

In a typical residential construction project, the excavation contractor shows up after the surveying crew determines the house and lot boundaries. The contractor removes the soil to the depth required for the new foundation and ensures that the soil is firm through compaction tests and compaction with equipment, if necessary. The dig requirements are precise, so the excavation contractor must be able to use a level and transit to match the grade posted by the surveying crew. After the foundation contractor pours the footers and stem wall, the excavation contractor backfills around the new foundation.

Contracting

Excavation contractors are business owners and are considered subcontractors because their job is often just one part of a larger project. A homeowner can contact an excavation contractor for a personal job, such as digging for a swimming pool, but the excavation contractor won’t oversee the entire project. Excavation contractors often work under the direction of general contractors, who solicit bids, coordinate subcontractor timelines and pay the excavation contractor when he completes his part of the project.
Our services Demolition, Excavation, Trucking, Hauling Junk removal and allows us to be in the market as a leader in industrial. Visit us at www.dcidemolition.com and you can find how we can serve you.